英文    簡体     繁体
 
Services
  Coring Hole Method
  Blade Saw Cut
  Wire Saw Cut
  Concrete Crushing
  Concrete Bursting
  Remote Control Robotic...
  Floor Treatment
  Grouting Rebar
  Detecting Rebar
  Sand Blasting
Member of
      Advance Concrete Drill Cut Co Ltd.
常用單位轉換表  

度量单位 单位转换 使用范例
长度
1 in. = 25.4 mm

12 in. x 25.4 = 304.8 mm
1 in. = .0254 m 120 in. x .0254 = 3.05 m
1 ft. = .3048 m 12 ft. x .3048 = 3.68 m
1 mm = .03937 in. 100 mm x .03937 = 3.94 in.
1 m = 39.37 in 10 m x 39.37 = 393.7 in.
1 m = 3.281 ft 10 m x 3.281 = 32.81 ft.
重量
1 lb. = .454 kg 10 lbs. x .454 = 4.54 kg
1 kg = 2.205 lbs. 10 kg x 2.205 = 22.05 lbs.
压力
1 psi = .069 bar 20,000 psi x .069 = 1,380 bar
1 bar = 14.5 psi 1,000 bar x 14.5 = 14,500 psi
流量
1 gpm = 3.785 lpm 30 gpm x 3.785 = 113.55 lpm
1 lpm = .264 gpm 100 lpm x .264 = 26.4 gpm
压强
1 lb. (f) = 4.44 N 100 lbs.(f) x 4.44 = 444 N
1 N = .2248 lbs.(f) 900 N x .2248 = 202.32 lbs.(f)
功率
1 hp = .7457 kw 50 hp x .7457 = 37.29 kw
1 kw = 1.341 hp 50 kw x 1.341 = 67.05 hp
空气流量
1 cfm = .47195 l/s 10 cfm x .47195 = 4.72 l/s
1 l/s = 2.1189 cfm 10 l/s x 2.1189 = 21.2 cfm
注: gpm: 加仑/分钟 hp: 马力 lpm: 升/分钟 kw: 千瓦
本頁數据謹供参考,如有錯漏,本公司概不負責
  Top Send By E-Mail
Project Reference
Demolition work for “Windsor”...
“Windsor” building located at the junction between Victoria Park and Georg...
Demolition work for the Monum...
The monument at crematorium needed to be demolished and rebuilt. Due to th...
Demolition work for Siu Ho Wa...
Under the renovation work for the sewerage plant, a concrete wall of thick...
Demolition Work for the Flyov...
13 meters long of flyover needed to be renovated and demolished, our compa...
Demolition work for Heng Seng...
The bank safe at the basement with the reinforced concrete wall needed to ...
Home   |   About us   |    Project reference   |   Partners   |   Information   |    News   |     Knowledge   |     Contact us   |    Other
Copyright©2009 Advance Concrete Drill Cut Co Ltd.