Demolition work for “Windsor” Building |
|
|
“Windsor” building located at the junction between Victoria Park and George Street and surrounded by many renowned shopping malls. It is one of the busiest streets in the Causeway Bay, HongKong. The renovation work for the floor was starting from the floor to 7/F. The demolition work included the existing concrete slab, beam, wall column and staircase etc., the volume of the demolished concrete was 600 m3 and the contract period was 2 months. Our company used the remote control demolition with noiseless method and only took 50 days to complete the work. It would not affect the building itself and the adjacent shops all around. |
|
Blade saw cut for the wall |
|
Blade saw cut for the wall |
|
Blade saw cut for the wall |
|
|
Blade saw cut for the wall |
|
Blade saw cut for the slab |
|
Blade saw cut for the slab |
|
Blade saw cut for the wall…remote control operated |
|
Blade saw cut for the wall…remote control operated |
|
Blade saw cut for the wall…remote control operated |
|
Blade saw cut for the staircase |
|
Blade saw cut for the staircase |
|