Demolition work for Siu Ho Wan Sewerage Plant |
|
|
Under the renovation work for the sewerage plant, a concrete wall of thickness 600 mm needed to be demolished and ensure that there was no vibration incurred to the surrounding structure. Our company used remote control operated wire saw cut the wall into the sections for removal. |
|
Site view for the demolition work |
|
Remote control operated wire saw cut |
|
Remote control operated wire saw cut |
|
|
|
Saw cut pieces removed off site |
|
Large piece of wall lifted up |
|
The subsequent layer saw cut |
|
The subsequent layer saw cut |
|
The subsequent layer saw cut |
|
The subsequent layer saw cut |
|