Projet Reference
Demolition work for “Windsor” Building
“Windsor” building located at the junction between Victoria Park and George Street and surrounded by many renowned shopping malls. It is one of the busiest streets in the Causeway Bay, HongKong. The renovation work for the fl...
Demolition work for the Monument at Crematorium
The monument at crematorium needed to be demolished and rebuilt. Due to the busy traffic at the entrance, the main contractor requested us to complete the demolition work in a short time. Our company used the remote control ...
Demolition work for Siu Ho Wan Sewerage Plant
Under the renovation work for the sewerage plant, a concrete wall of thickness 600 mm needed to be demolished and ensure that there was no vibration incurred to the surrounding structure. Our company used remote control operated w...
Demolition Work for the Flyover at Stanley Square
13 meters long of flyover needed to be renovated and demolished, our company used noiseless wire saw cut method for the flyover deck and column into sections for disposal.
Demolition work for Heng Seng Bank at Yuet Man Fong
The bank safe at the basement with the reinforced concrete wall needed to be demolished and ensure that the bank operation would not be affected. Our company used the remote control operated robotic breaker to crush the concrete w...
Coring method for “Mitsukoshi” Shopping Mall at Causeway, HK
After the demolition work was completed, the new pile could not penetrate the existing foundation structure, the main contractor requested us to use the coring method up to 5 meters deep for clearing off the obstruction.
Top
Send By E-Mail
Project Reference
Demolition work for “Windsor”...
“Windsor” building located at the junction between Victoria Park and Georg...
Demolition work for the Monum...
The monument at crematorium needed to be demolished and rebuilt. Due to th...
Demolition work for Siu Ho Wa...
Under the renovation work for the sewerage plant, a concrete wall of thick...
Demolition Work for the Flyov...
13 meters long of flyover needed to be renovated and demolished, our compa...
Demolition work for Heng Seng...
The bank safe at the basement with the reinforced concrete wall needed to ...