英文    簡体     繁体
 
Services
  Coring Hole Method
  Blade Saw Cut
  Wire Saw Cut
  Concrete Crushing
  Concrete Bursting
  Remote Control Robotic...
  Floor Treatment
  Grouting Rebar
  Detecting Rebar
  Sand Blasting
Member of
      Advance Concrete Drill Cut Co Ltd.
Wire Saw Cut
Play Video
jiange
 
It has more advantages and flexible features than the others. The equipment is composed with the combination of wireless, hydraulic pump and wire transmission. The method is operated with the movement of the cutting bits
Wireless, remote control method is widely, flexible and safer.
 
Special features:
  • Low noise,10000 mm test distance is 50 db
  • No dust-no pollution generated
  • Precious and accurate-fixing frame to stabilize the cutting
  • Flexible-more advantages for the narrow and less space
  • No vibration- do not cause the concrete structure damage and crack
  • Demolition/ Features
    Damage to the surrounding structure
    Environmental index
    Follow-up action after the work
    Working period
    Traditional chiseling
    Yes
    Bad
    Yes
    Long
    Wire saw cut
    No
    Good
    No
    Short
     
    Scope of work:
    The wire saw cut method is widely used for the large and mass reinforced concrete structure, irregular shape/ object, underwater stone, e.g. bridge deck, wall, column, beam and other structural concrete members and even the cutting for rebar, steel beam and steel plate.
     
    Construction sequence:
    Lines setting-out for cutting piec >> preparing to drill for the lifting holes >> cutting >> hoisting
     
    Wire saw cut for mass concrete tructure 
    Wire saw cut for mass concrete tructure 
    Wire saw cut for mass concrete tructure 
    Wire saw cut for mass concrete tructure 
    Wire saw cut for mass concrete tructure 
    Wire saw cut for mass concrete tructure 
         
      Top Send By E-Mail
    Project Reference
    Demolition work for “Windsor”...
    “Windsor” building located at the junction between Victoria Park and Georg...
    Demolition work for the Monum...
    The monument at crematorium needed to be demolished and rebuilt. Due to th...
    Demolition work for Siu Ho Wa...
    Under the renovation work for the sewerage plant, a concrete wall of thick...
    Demolition Work for the Flyov...
    13 meters long of flyover needed to be renovated and demolished, our compa...
    Demolition work for Heng Seng...
    The bank safe at the basement with the reinforced concrete wall needed to ...
    Home   |   About us   |    Project reference   |   Partners   |   Information   |    News   |     Knowledge   |     Contact us   |    Other
    Copyright©2009 Advance Concrete Drill Cut Co Ltd.